Project: "Aluminaire"   -  
            Last 10 Modified Project Activities / Entries :
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Glenn Gordon   -  
Project:   Timber Tiger - ST-L Clipped-wing   -   VIEW REPORTS
Total Hours:646.9
Start/Last Date:Jun 01, 2022 - No Finish Date
Engine:Rotax 912ULS with big bore cylinder upgrade
Propeller:Sensenich Ground Adjustable
Panel:VFR / Glass / ADS-B / Comm / Xpndr / 2 Axis Autopilot
 
Friendly URL: https://eaabuilderslog.org?s="Aluminaire"

Home or Last Project Picture

May 26, 2024     Aileron fiberglass reinforcing tape and rib stitching complete. - (8 hours)       Category: Wings
Aileron fiberglass reinforcing tape and rib stitching completed.


 
May 27, 2024     Tail feather gap fairing fitting and bonding. - (4 hours)       Category: Tail Feathers
Tail feather gap fairing fitting and bondin


 
May 25, 2024     Wing stub and aileron bay sidewall covering. - (4 hours)       Category: Wings
Wing stub and aileron bay sidewall covering.


 
May 22, 2024     Aileron stich layout. - (2 hours)       Category: Wings
Aileron stich layout.


 
May 18, 2024     Aileron Bellcrank centering spacer fabrication and install. - (3 hours)       Category: Wings
Aileron Bellcrank centering spacer fabrication and install.


 
May 25, 2024     Learning the Staggerwing Knot. - (2 hours)       Category: Tail Feathers
Learning the Staggerwing Knot.


 
May 25, 2024     Rib Stitching the elevator. - (3 hours)       Category: Tail Feathers
Rib Stitching the elevator.


 
May 25, 2024     1st stitching complete! - (2 hours)       Category: Tail Feathers
1st stitching complete!


 
May 09, 2024     Aileron fabric bridging workdown.       Category: Wings
Aileron fabric bridging workdown.


 